Case Studies
Sacramento Food Bank
- Category: Case Studies
- Published on Thursday, May 19 2011
Client Name: Sacramento Food Bank & Family Services
Client Address: 3333 Third Ave., Sacramento, CA
Job Type: Commercial
Scope of Work: Surface Preparation, Water Vapor and Alkalinity System, Coating Clear Sealer
Project Size: 2600 square feet
Project Highlights: We donated all the labor for free of charge to support our local area food bank and
Walgreens
- Category: Case Studies
- Published on Thursday, May 19 2011
Client Name: Walgreens, Granite Bay
Client Address: Sierra College, Granite Bay, CA
Job Type: Commercial
Scope of Work: Flooring Removal, Surface Preparation, Water and Alkalinity Control System, Flooring Installation
Project Size: 12,000 square feet
Project Highlights: This store had high levels of water vapor. We correct the water vapor issues so this store location could have their specified flooring installed and warranted
Davis Flight Support
- Category: Case Studies
- Published on Thursday, May 19 2011
Client Name: Davis Flight Support
Client Address: 1411 West Covell Blvd, Davis, CA
Job Type: Industrial Airplane Hanger
Scope of Work: Surface Preparation, Water Vapor and Alkalinity Control System, Specialty Coatings
Project Size: approximately50,000 square feet
Project Highlights: Reduced water vapor under 1 pound and with the Koesters VAP-1000 and installed a Tennent Epoxy floor
Raytek
- Category: Case Studies
- Published on Thursday, May 19 2011
Client Name: Raytek
Client Address: 1201 Shaffer Road, Santa Cruz, CA
Job Type: Industrial
Scope of Work: Surface Preparation, Water Vapor and Alkalinity Control System
Project Size: approximately 45,000 square feet
Project Highlights: We used the Koester VAP-1000 to reduce extremely high levels of water vapor
Napa County Airport
- Category: Case Studies
- Published on Thursday, May 19 2011
Client Name: Napa County Airport
Location: Runway 18R-36L, PW 07-06
Job Type: Airport Runway
Scope of Work: Crack Repair, Removal and Joint Seal Installation
Project Size: 60,680 lineal feet
Project Highlights: 80 percent of the runway did not contain backer rod, which made it difficult to remove the existing failing sealant. We created a tooling system for the removal and completed the job on time.<